spacer spacer
McLean Depot
Train Shop
spacer
Winter Hours
Mon - Fri 10 - 6
Saturday 10 - 5
309 - 244 - 5900
Oct - Apr
spacer

McLean Depot ca 1917

Circa 1917. Second mainline track was installed in 1905 and the depot was moved back about 14 feet to accomodate the new track. Building foundation is poured concrete. Concrete curbing framed the brick platform. About 20 daily trains served McLean at this time. McLean was the second busiest grain shipper on the entire Alton Route.

spacer